Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 06/27/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.威廉R 盖恩斯小. Veterans Memorial Park Phase II
Last Updated: 06/27/2024 Category: Parks And 娱乐 Category: 已缴纳的销售税 当前阶段: Design Development
威廉R. 盖恩斯小. Veterans Memorial Park phase II design and construction.Mid-County Library Hurricane Repairs
Last Updated: 06/27/2024 Category: 县设施 当前阶段: Design Development
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Last Updated: 06/27/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.Last Updated: 06/27/2024 Category: Parks And 娱乐 Category: 已缴纳的销售税 当前阶段: Design Development
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and 娱乐 master Plan.Peachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 06/24/2024 类别:巷道 当前阶段: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.